The Atlas Process - Phase 3

Process3.jpg

Completing the Job

Your foundation is raised where the Foundation Plus pilings have been installed. Jacks are placed on top of the pilings and an experienced Atlas technician directs the raising of the foundation. Then, we clean up. The top portion of the hole is filled, surface concrete breakthroughs are patched. Plants are replanted, the yard, walkways and drive are cleaned. The entire process usually takes one to three days.